Managed two-way sync for city and county public works: AI-detected road issues become real work orders, and completed work closes the loop. City of Meridian Falls (sample agency).
Staging demo, sample data only. Nothing on this page is connected to a live system. The Samsara side is modeled on Samsara's public developer documentation. The OpenGov EAM side is simulated from published EAM documentation, because the EAM API is available to customers only; validating it against a real instance is the design partner step. A working prototype to react to, not a finished product.
Samsara Ground Intelligence
Modeled on Samsara's public developer documentation (Ground Intelligence API)
Watchpoints
What it is
A pinned map location where Samsara collects privacy-filtered dashcam observations as equipped vehicles pass
Verification is a person reviewing the footage in the Samsara dashboard. There is no automatic verified status, and this demo does not invent one.
Bridge Dashboard
The product: one place where both systems agree
1Records synced
3Open requests
0Issues resolved by write-back
1Failures waiting
Samsara Road Issue
OpenGov EAM
Note
id
Request external / source ID
Stored on the Request so the write-back always finds its issue
type (pothole, roadCracking, ...)
Request Issue (Issues Library)
Issue selection sets the department and default priority
severity (low, medium, high)
Request / Task Priority
Mapping published in Samsara's own integration guide
location (latitude, longitude)
Request and Task location
Pins the work to the map location the fleet observed
roadSegment.roadName
Street / asset description
Matched to the pavement segment asset where the agency maintains one
dashboardUrl
Evidence link on the Request
Crews open the Samsara dashboard to inspect the video evidence
observationCount
Detection count on the Request
Repeat detections aggregate into the same issue; no duplicate Requests
firstSeenTime / lastSeenTime
Detection timestamps
Carried for the audit trail and pavement history
status: resolved (write-back)
Triggered by Task Completed and Work Order closed
The bridge PATCHes the Samsara issue to resolved, closing the loop
Mapping follows the field pairing Samsara publishes in its Ground Intelligence integration guide. EAM field names are confirmed against the partner agency's configuration during onboarding.
Nothing is ever silently overwritten. Anything that cannot be matched cleanly waits here for a person.
System
How the bridge connects
Status in this demo
Samsara
Public Ground Intelligence API: issues list, issue update, Watchpoint create
Simulated here; endpoints and fields per Samsara's public developer documentation
OpenGov EAM
Customer API access, confirmed with the partner agency
Simulated here; validation against a real EAM instance is the design partner step
OpenGov EAM (Cartegraph)
Modeled on published EAM documentation. Will be re-mapped to the partner agency's actual configuration.
Requests created by the bridge will appear here. Send a Samsara issue across to create the first one.